中文
apps
中文
apps
Don’t relax in epidemic prevention, and don’t stop in ensuring production!
date_range2022-09-06 layersCompany News

The epidemic is an order, and prevention and control are a responsibility. Since the outbreak of the epidemic in Chengdu on August 25, Chengdu Chenggao Valve Co., Ltd. has strictly implemented the requirements of provincial, municipal and county epidemic prevention and control work, quickly launched emergency plans for epidemic prevention and control, strengthened the regular management of epidemic prevention and control, and timely released the 20th document of the company's epidemic prevention and control management. Actively take measures including employees holding 24-hour nucleic acid negative certificate at work, strengthening the management of external vehicles and personnel entering the factory, reducing staff travel, and strengthening the dynamic management of employees in all departments to do a good job in epidemic prevention and control.

On the morning of September 1, the Chengdu Municipal Epidemic Prevention and Control Headquarters issued the "Notice on Carrying out Nucleic Acid Testing for All Employees in the City." After the "Notice" was issued, Chengdu Chenggao Valve Co., Ltd. promptly held an emergency meeting on epidemic prevention and control. In order to strictly implement epidemic prevention and control management while ensuring the delivery of products required for major national engineering projects, the company quickly formulated an emergency plan for closed-loop production management in accordance with the relevant requirements for closed-loop production, prepare raw materials, parts, production equipment, accommodation, living, epidemic prevention and other materials, and organize closed-loop production personnel to learn closed-loop management requirements. After review by the superior management department, it was agreed that our company should be included in closed-loop management, implement closed-loop production, strictly implement epidemic prevention and control requirements, and operate in a safe and orderly manner.

During the closed-loop production management period, the main leaders of the company took the lead in stationed in the factory area, coordinating and cooperating with the outside world, strictly implementing the emergency plan for closed-loop production management, consolidating management responsibilities, organizing production within the area according to production needs, strengthening station management measures, strengthening production safety management, caring for the physical and mental health of closed-loop production employees, and standing at the forefront of epidemic prevention and control work. Under the "closed-loop production + work from home" model, all employees work together to ensure production and maintain the efficient operation of the company's production and operations under special conditions, demonstrating the resilience and responsibility of people in CHV.

图片17

图片18

In order to ensure the on-time delivery of the products of a certain national key engineering project, the operating staff of each process of the production department and the staff of relevant departments work closely together to ensure production and ensure tasks;

图片19

图片20

In order to ensure timely delivery of products for the Wenshan-Yanshan Natural Gas Branch Pipeline Project, the employees of the company's production department three actively cooperated with the department's arrangements and implemented a two-shift working system;

图片21

CHV technicians cooperated with the production department to solve technical problems of the cryogenic LNG surface engineering cut-off valve in the Shenmu Gas Field of the Jidong Oilfield;

图片22

In order to ensure that the company's closed-loop production employees can complete nucleic acid testing in an orderly and fast manner, Dai Tao, an employee of the company's innovation center, as a member of the public welfare organization Dayi County Thunder Emergency Rescue Service Center, actively assists medical staff in scanning employee health codes;

图片23

图片24

On September 3rd, the higher-level party organization called on home-based party members to actively report to the local party organization for enrollment and on-site job transfer to carry out volunteer services. Comrade Li Yong, a party member of the company's four branches, actively responded to the call of the party organization, timely reported to the local party organization in Xinchang Town, Dayi County, and participated in local epidemic prevention and control work.

 

After experiencing high temperature power restrictions, although the epidemic has once again slowed down the pace of CHV's work, in order to cooperate with the government's unified deployment and achieve the goal of zero social coverage as soon as possible, CHV will strictly comply with epidemic prevention requirements, continue to implement "closed-loop production + work from home", and do its best to ensure the completion of production tasks with quality assurance. All people from CHV will help each other and work together to overcome the difficulties and contribute to scientific and accurate dynamic clearing!


Contact Us
Tel: 028-88208258    028-84847520
Email: sales@china-cfft.com    cfft@china-cftt.com
Address:
No.6, Guanghua Rd., Dayi County, Chengdu, Sichuan, China. (611330)
67, Section 1, Xueshan Avenue, Dayi County, Chengdu City, Sichuan Province
CHV Wechat
CFFT Wechat
COPYRIGHT © Chengdu Chengfeng Flow-Tech Group Co., Ltd.